The original estuary bay was found at a lower level to the sea and with an inverse slope, leading inland instead of seaward. Both natural as well as recent interventions, became key components in the new composition. The estuary was cleared and reconstructed as a water filter, layered with sand, rocks and finished in river boulders, following the natural slope. The easternmost side was supported by a tired gabion wall, utilising similar river boulders, to act as a retaining wall and as percolation filter of natural ground waters. A pedestrian walkway, along the west estuary flank links to the existing coastal promenade, constructed of white monolithic pebbled concrete with exposed aggregate. The philosophy of the constructed walkway continues, treated as a suspended surface resting on piles set into the beach, with a sloping scarp towards the water. A wooden bridge suspended over the estuary slopes down to touch the beach.
Client: THE VOROKLINI COUNCIL
Project Partner: SEVINA FLORIDOU
Categories: Urban Development
Location: VOROKLINI, Cyprus
ADC: implemented/built after an ADC, negotiation procedure 2004
Project Gallery
MDSF_P01.jpg
MDSF_P02.jpg
MDSF_P03.jpg
MDSF_P04.jpg
MDSF_P05.jpg
1.jpg
Margarita Danou
Margarita Danou Architects
Architect, ADC Expert
http://MargaritaDanouArchitects
Cyprus